TAKE ACTION today...
Write to the Welsh Assembly Planning Inspectorate
Crown Buildings Cardiff CF10 3NQ
wales@pins.gsi.gov.uk
Objections by 24 December 2009 quoting appeal reference
APP/Z6815/A/09/2113747/WF
very inconvienient timing for the unsuspecting public...
Viridor are planning a massive incinerator in Trident Park, between Ocean Way and the Docks.This will burn 350,000 tonnes of waste a year.
Some points to raise again..
It is too big! Burning waste from all over South Wales
Big incinerator contracts for large amounts of waste have been
shown to reduce recycling rates.
260 more lorries per day on Cardiff Roads!
All day increasing pollution and congestion!
Greenhouse gases - ultra fine particles and dioxins
Incinerators have the highest emissions of harmful substances compared with other waste management options. It produces of poisonous dioxins -
Toxic Waste - 120,000 tonnes of waste ash per year!
One third of waste will become ASH. 17,500 tonnes of that will be
toxic and need special hazardous waste disposal.
What do we do with the 17,500 tonnes of hazardous toxic ash?
They expect to send it
Generating energy from burning waste is NOT efficient or renewable
Can we use the heat from the Viridor incinerator?
There can only be a WASTE of heat! There are no realistic uses for the immense 70 MW heat, year-round with no back-up supply in the event of breakdown and maintenance down-time. No evidence that Viridor has any real plans to lay costly pipes needed to actually supply any of the heat at all. Against WAG policy
ALTERNATIVES
Waste should be dealt with locally using MBT (mechanical, biological, treatments,) which produces soil and reclaims recyclables.
We need to MAXIMISE recycling and composting
TAKE ACTION write a letter of objection
Write to Welsh Assembly, Planning Inspectorate, Crown Buildings
Cardiff CF10 3NQ
Objections by 24 December 2009 quoting appeal reference
APP/Z6815/A/09/2113747/WF
free guide to appeals from inspectorate..029 2082 3889
Viridor have been encouraged by the promotion of
Project Gwyrdd(project green)
Will it save money building a massive incinerator?
No, it may end up costing us a fortune and tied in to a contract councils can’t get out of.
Viridor cannot build their costly giant incinerator unless they get a long-term (25 yr) contract from
FACTS
- giant incinerator 350 000t/yr, over-sized even for the 5 Scam Gwyrdd councils
- domestic waste is decreasing with more recycling,
- residual waste to reduce to 130 000 tons/yr for the 5-authority region
- other waste facilities in other Council areas could and should come much sooner
- Viridor said half their waste for burning would be industrial/commercial – but it’s not needed as their recycling is increasing fast (avoiding the high incineration costs).
Is the Viridor incinerator efficient?
It is so Very inefficient – it is called waste ‘disposal’ under European standard